Availability: | |
---|---|
Quantity: | |
DG-15BBL
DEGONG
Composition |
Mash / Lauter Tank
Boiling / Whirlpool tank
Stainless Steel Work Platform with Handrails
30 Barrel Automated HLT
Fully Welded Sanitary Process Piping System
Complete Electrical Package
Removable Two Head Manual Keg Washer
Mash / Lauter Tank
66” inner diameter all stainless steel 304 construction, dished top and bottom.
Fully TIG welded assembly. Internal welds are smoothed with external welds acid cleaned and re-grained. External welds are stripe buffed.
Mash mixer motor and gear box assembly installed on top of unit.
Auto mash out assembly to include
Removable mash-out chute discharging to your remote waste tub.
Internal mash grid assembly with (6) wedge wire removable screens for ease of cleaning.
(1) 17” x 21” sealed access door.
(1) 18” sealed top man door access.
(1) Thermo-well installed with RTD for measuring temperature in mash / lauter tun (Please note that we recommend a 42” digital wand to measure multiple places in mash / lauter tun to gauge an accurate temperature).
(1) Fully welded steam jacket with rear exit protruding steam/condensate nipples on main body.
4” diameter leg assembly with standard anchor pads.
2” mineral wool insulation with 14 gauge polished stainless steel outer shell.
We include a hydrator for installing a grist hopper feed.
Boiling / Whirlpool Tank
60” inner diameter all stainless steel 304 construction, dished top and bottom.
(1) 18” sealed top man door access.
4” diameter leg assembly with standard anchor pads.
2” mineral wool insulation with 14 gauge polished stainless steel outer shell. (1) 8” diameter steam flue slip flange with condensation gutter and drain port.
Fully TIG welded assembly. Internal welds are smoothed with external welds acid cleaned and re-grained. External welds are stripe buffed.
Internally mounted/removable trub dam.
Internally mounted ladder assembly for easy cleaning access.
(3) Fully welded steam jackets with rear exit protruding steam/condensate nipples. Two jackets are installed on the side circumference of the tank and one is installed on the bottom dish.
Contact us |
The special attention we give in the final quality inspection of each work is also a guarantee of unparalleled reliability and robustness. If you have any needs or questions, please contact us.
Composition |
Mash / Lauter Tank
Boiling / Whirlpool tank
Stainless Steel Work Platform with Handrails
30 Barrel Automated HLT
Fully Welded Sanitary Process Piping System
Complete Electrical Package
Removable Two Head Manual Keg Washer
Mash / Lauter Tank
66” inner diameter all stainless steel 304 construction, dished top and bottom.
Fully TIG welded assembly. Internal welds are smoothed with external welds acid cleaned and re-grained. External welds are stripe buffed.
Mash mixer motor and gear box assembly installed on top of unit.
Auto mash out assembly to include
Removable mash-out chute discharging to your remote waste tub.
Internal mash grid assembly with (6) wedge wire removable screens for ease of cleaning.
(1) 17” x 21” sealed access door.
(1) 18” sealed top man door access.
(1) Thermo-well installed with RTD for measuring temperature in mash / lauter tun (Please note that we recommend a 42” digital wand to measure multiple places in mash / lauter tun to gauge an accurate temperature).
(1) Fully welded steam jacket with rear exit protruding steam/condensate nipples on main body.
4” diameter leg assembly with standard anchor pads.
2” mineral wool insulation with 14 gauge polished stainless steel outer shell.
We include a hydrator for installing a grist hopper feed.
Boiling / Whirlpool Tank
60” inner diameter all stainless steel 304 construction, dished top and bottom.
(1) 18” sealed top man door access.
4” diameter leg assembly with standard anchor pads.
2” mineral wool insulation with 14 gauge polished stainless steel outer shell. (1) 8” diameter steam flue slip flange with condensation gutter and drain port.
Fully TIG welded assembly. Internal welds are smoothed with external welds acid cleaned and re-grained. External welds are stripe buffed.
Internally mounted/removable trub dam.
Internally mounted ladder assembly for easy cleaning access.
(3) Fully welded steam jackets with rear exit protruding steam/condensate nipples. Two jackets are installed on the side circumference of the tank and one is installed on the bottom dish.
Contact us |
The special attention we give in the final quality inspection of each work is also a guarantee of unparalleled reliability and robustness. If you have any needs or questions, please contact us.