10BBL Popular Brewing System Craft Beer Brewhouse Stainless Steel Fermentation Tank Turnkey Project for Sale
Home » Brewery Equipment » Beer brewery equipment » 10BBL Popular Brewing System Craft Beer Brewhouse Stainless Steel Fermentation Tank Turnkey Project for Sale

Product Detail

loading

Share to:
sharethis sharing button

10BBL Popular Brewing System Craft Beer Brewhouse Stainless Steel Fermentation Tank Turnkey Project for Sale

Popular 10bbl brewing system 1200l beer brewing equipment. DEGONG is the leading Microbrewery equipment supplier in China, our service include the brewery design, equipment manufacture, Installation at site and brewing technology transfer. We provide complete beer brewing solutions that include: malt handling system, brew house system, beer fermenting/storage system, cooling system, cleaning system, control system, package line.
Insulation:
Material:
Thickness of material (mm):
Heating method:
Manhole:
Availability:
Quantity:
  • DGET-10BBL

  • DGET

  • 8438400000

DEGONG brewery feature

  • All the tanks insulation use argon arc welding and inner tank will do pickling and passivation or mirror polishing

  • Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts

  • All the steam heating beer brewery tank will do water and pressure test when finishing. Pressure test is 2-4bar

  • Dimple jackets are standard on insulated vessels, providing greater cooling efficiency and added vessel integrity

  • All fermentation vessels feature jackets on the cone for greater cooling efficiency

  • Fermentation vessels have half batch capabilities


750套图1-min


10BBL popular beer equipment brewhouse system

Combination:mash/lauter tun+boiling/whirlpool tun+hot water tank

Every Weld Blended and Finished to a Smooth Sanitary Finish

Stainless steel brewing platform & integrated stairs or ladder with adjustable footpads for platform leveling

Stainless steel hard piping and brewhouse manifold with butterfly valves, Sight glass and all required clamps and gaskets to hook tanks together

Stainless steel steam condensation stack with spraying nozzles.

Sanitary centrifugal pump for mash, wort or hot water transfer

Fixed speed or various speed agitator and rake for efficient lautering and spend grain removing

High Efficiency multi-pass plate type heat exchanger with thermometer and oxygenate aeration stone port (stone not included)

V-Wire False Floor Included in Mash/Lauter Tun – virtually guarantees consistent wort flow

Compact- Space Saving and flexible Brewing Configurations

Standard Thermometers

VFD controlling for pumps and motors


750BW-min

10BBL 3-vessel brewhouse: mash/lauter tun+boiling/whirlpool tun+hot water tank


10BBL popular beer equipment fermentation tank

The number of fermentation tanks is determined by the output of beer.

Material: stainless steel 304/316

Fine polishing to 0.4~0.6um without dead corner

Insulation:pilyurethane:80-100mm

Cooling media: glycol water tank

Dry hopping port on top                                  

Top manway,Sample valve

Relief/vacuum valve on top, 3bar

Test Pressure:0.3Mpa

Rotating racking arm

4 support legs with height adjustable foot

Complete valves, fittings and all parts

Optional:Carbonation stone, hops gun


750 FV-min

beer double wall fermentation tanks


750 fer 细节图-min2

fermentation tank accessories

DEGONG Quality control

1. After receiving the order, we will hand over the technical personnel to design the equipment drawings. After the drawings are completed, they will be submitted to the cheif engineer for review. If there is no problem, they will be submitted to the customer for review.

2. before the production, technical staff, seller and procurement, production department, etc. will discuss the technical details of the equipment; If no problem, hand in the drawings, the technical list to the production and procurement department.

3. In the production process, the quality inspection personnel will regularly check the production details of the equipment and re-qualify the production.

4. When the equipment is completed, it will be inspected by the quality inspectors.


How to test quality of finished products?

1. Pipe connection, water test for 24 hours

2. The inner cone is polished to 0.4μm, and the inner cylinder and the outer cone are protected by the surface; the inner and outer of the dish-shaped head, the outer cover and the outer cylinder are sandblasted;

3. After the production is completed, the cylinder is filled with water for leak test, and the jacket is subjected to water and pressure test, and the test pressure is 0.4 MPa


联系方式2 PC-min

Previous: 
Next: