Thickness of material (mm): | |
---|---|
Insulation: | |
Heating method: | |
Construction: | |
Material: | |
Availability: | |
Quantity: | |
DGET- 2000L
DGET
8438400000
The beer brewery is complete with all equipment. All equipment are with high standard an very simple to use. According to the requirements of different customers, the beer brewing system can be customized according to the different standard.
3-Vessel Beer brewhouse introduction |
3-vessel brewhouse prepare for continuous brewing which is more convenient and efficient. the second mashing start during the first lautering process. This saves time spent on mashing process.
Basic configuration:
2000 liter mash tun
2000 liter lauter tun
2000 liter kettle/whirlpool tun
Detailed configuration:
1.2000L Mash tun
Material: SUS 304
Total volume: 2600L, effective volume: 2000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Top fittings: Manhole with sight glass, light,gearbox&motor
Side fittings: Thermo well
Steam jacket on both cylinder and cone bottom
Motor brand:VFD controlled
Stir type: paddle type
With recirculation unit for wort clearance.
2.2000L Lauter tun
Material: SUS 304
Total volume: 2600L, effective volume: 2000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Top fittings: Manhole with sight glass, light,gearbox&motor
Side fittings: Thermo well, liquid level (optional)
Bottom fittings: counter washing device, wort collecting pipe
Bottom spent grain door, flange type
Wedge wired filter plate, with the gap of 0.7-0.9mm
Tank bottom with horn shape outlet for wort collecting
Rotating spray ball inside, qty: 2
Coil pipe for sparging
Motor brand: VFD controlled
Stir type: raker shape
3.2000L Kettle/whirlpool tun
Total volume: 2600L, effective volume: 2000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Top fittings: Manhole with sight glass, light
Side fittings: Thermo well, liquid level (optional), wort inlet,steam jacket
Rotating spray ball inside
Steam jacket on both cylinder and cone bottom
Central venting pipe
Tangent inlet at side place
4.4000L Hot water tank
Total volume: 4800L, effective volume: 4000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Steam heating with steam coil for increasing the heating speed.
PT100 temp sensor.
Top fittings: normal pressure manway, CIP arm and spray ball, Lifting ear, venting pipe.
Side fittings: Temp sensor PT100, liquid level, recirculation pipe.
Bottom fittings: Draining outlet, water outlet.
with over flow pipe for safety.
HLT installed with level sensor for automatic water feeding.
5.Wort grant
Material: Stainless steel 304.
Volume: 50 L.
Rotating spray ball inside
Wort inlet: 38 mm, outlet: 38 mm.
Bypass for wort not going into buffer tank.
Position: the same level with lauter tun filter plate.
Function: Avoiding vacuum problem and protecting tanks.
6.Working platform
Material: stainless steel 304
Handrails on platform and steps
Convenient working height for brew house tanks
Designed as actual building requirement
The control panel can be mounted on the platform or below it.
7.Wort pump Hot water pump
Material: SUS 304.
Sanitary grade.
Flow rate:3 m3/h, lift height: 18m.
With VFD control.
Pump outlet with check valve and pressure gauge.
Control panel (optional)
The brew house will be completely installed before delivery for works inspection. All connections/fittings for water pipe, gas and electrical, exhaust vapour, chimney and waste discharge must be done by the client in order to start the production.
Beer fermentation tank introduction |
Stainless steel conical beer fermenter are also called CCT’s (Cylindrical Conical Tanks), FV’s (Fermentation Vessel), primary fermenter or unitanks as they are used both for fermenting and lagering.Fermenting is the process during which the yeast transforms the wort into beer. Lagerings takes place after fermenting and is the time given to the beer to stabilize and age after fermenting.
All of our fermentation tank are pressure tested, 100% sanitary welded, jacketed and insulated. Outter shell: SUS304, thickness 1.5mm, brushed finished
Inner container: SUS304, thickness 3mm, smooth ground welds - 2B finish
Glycol jacket: SUS304, thickness 2mm, dimple welded
Insulation material: polyurethane, 80 mm thickness
Head space: 25% over stated size
Pressure rating: 1.5bar working pressure
Connections: PVRV, multi-zone coolant inlet/outlet, Pt100 interface, sample valve, shadowless side man-door, hop port, carb stone, separate blow-off pipe, rotating CIP ball and piping, rotating racking arm, analog temperature gauge, and over-sized yeast dump port.
Company information |
If you have interest in beer brewing industrial,welcome to contact me freely
The beer brewery is complete with all equipment. All equipment are with high standard an very simple to use. According to the requirements of different customers, the beer brewing system can be customized according to the different standard.
3-Vessel Beer brewhouse introduction |
3-vessel brewhouse prepare for continuous brewing which is more convenient and efficient. the second mashing start during the first lautering process. This saves time spent on mashing process.
Basic configuration:
2000 liter mash tun
2000 liter lauter tun
2000 liter kettle/whirlpool tun
Detailed configuration:
1.2000L Mash tun
Material: SUS 304
Total volume: 2600L, effective volume: 2000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Top fittings: Manhole with sight glass, light,gearbox&motor
Side fittings: Thermo well
Steam jacket on both cylinder and cone bottom
Motor brand:VFD controlled
Stir type: paddle type
With recirculation unit for wort clearance.
2.2000L Lauter tun
Material: SUS 304
Total volume: 2600L, effective volume: 2000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Top fittings: Manhole with sight glass, light,gearbox&motor
Side fittings: Thermo well, liquid level (optional)
Bottom fittings: counter washing device, wort collecting pipe
Bottom spent grain door, flange type
Wedge wired filter plate, with the gap of 0.7-0.9mm
Tank bottom with horn shape outlet for wort collecting
Rotating spray ball inside, qty: 2
Coil pipe for sparging
Motor brand: VFD controlled
Stir type: raker shape
3.2000L Kettle/whirlpool tun
Total volume: 2600L, effective volume: 2000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Top fittings: Manhole with sight glass, light
Side fittings: Thermo well, liquid level (optional), wort inlet,steam jacket
Rotating spray ball inside
Steam jacket on both cylinder and cone bottom
Central venting pipe
Tangent inlet at side place
4.4000L Hot water tank
Total volume: 4800L, effective volume: 4000L
Inner tank thickness: 3mm, outer cladding thickness: 2mm
Surface treatment: Inner mirror polishing and outer 2B finish
Inner tank treatment: polished, roughness: 0.4um
Cone top, cone bottom, 100mm rock wool insulation
Steam heating with steam coil for increasing the heating speed.
PT100 temp sensor.
Top fittings: normal pressure manway, CIP arm and spray ball, Lifting ear, venting pipe.
Side fittings: Temp sensor PT100, liquid level, recirculation pipe.
Bottom fittings: Draining outlet, water outlet.
with over flow pipe for safety.
HLT installed with level sensor for automatic water feeding.
5.Wort grant
Material: Stainless steel 304.
Volume: 50 L.
Rotating spray ball inside
Wort inlet: 38 mm, outlet: 38 mm.
Bypass for wort not going into buffer tank.
Position: the same level with lauter tun filter plate.
Function: Avoiding vacuum problem and protecting tanks.
6.Working platform
Material: stainless steel 304
Handrails on platform and steps
Convenient working height for brew house tanks
Designed as actual building requirement
The control panel can be mounted on the platform or below it.
7.Wort pump Hot water pump
Material: SUS 304.
Sanitary grade.
Flow rate:3 m3/h, lift height: 18m.
With VFD control.
Pump outlet with check valve and pressure gauge.
Control panel (optional)
The brew house will be completely installed before delivery for works inspection. All connections/fittings for water pipe, gas and electrical, exhaust vapour, chimney and waste discharge must be done by the client in order to start the production.
Beer fermentation tank introduction |
Stainless steel conical beer fermenter are also called CCT’s (Cylindrical Conical Tanks), FV’s (Fermentation Vessel), primary fermenter or unitanks as they are used both for fermenting and lagering.Fermenting is the process during which the yeast transforms the wort into beer. Lagerings takes place after fermenting and is the time given to the beer to stabilize and age after fermenting.
All of our fermentation tank are pressure tested, 100% sanitary welded, jacketed and insulated. Outter shell: SUS304, thickness 1.5mm, brushed finished
Inner container: SUS304, thickness 3mm, smooth ground welds - 2B finish
Glycol jacket: SUS304, thickness 2mm, dimple welded
Insulation material: polyurethane, 80 mm thickness
Head space: 25% over stated size
Pressure rating: 1.5bar working pressure
Connections: PVRV, multi-zone coolant inlet/outlet, Pt100 interface, sample valve, shadowless side man-door, hop port, carb stone, separate blow-off pipe, rotating CIP ball and piping, rotating racking arm, analog temperature gauge, and over-sized yeast dump port.
Company information |
If you have interest in beer brewing industrial,welcome to contact me freely