Availability: | |
---|---|
Quantity: | |
DGET-7BBL
DEGONGET
8438400000
7BBL 2-vessel fully automated beer brewhouse system
Components of a complete set of brewery system |
Brewhouse system
| Lauter tun |
Mash kettle | |
Mash pump | |
Combined pipes | |
Frequency inverter | |
crusher | |
Heat exchanger | |
Oxygen adder | |
Fermenting tanks
| Fermenting tank |
Valve pipe | |
Cooling pipe | |
Thermal meter | |
Pressure meter | |
Cooling system | Cool water tank |
evaporator | |
refrigerator | |
Ice water pump | |
Pipe & valve | |
Controlling system | Power controlling cabinet. |
Meter controlling board | |
Refrigerator board | |
PLC control board for option | |
Washing system | Washing tanks |
Mobile pump | |
Valve & pipe | |
Beer sale section | Little wooden keg |
Beer valve | |
Soft pipe |
Beer brewhouse system |
Outside surface | RED COPPER or STAINLESS STEEL,THK:1.5mm-3mm |
Inner surface | S.S.304,THK:2mm-4mm |
Top shape | Seal head or conical head |
Heating method | Natural gas/electricity/LPG/direct fire |
Insulation layer | Protected by rockwool,THK:70-100mm |
Polishing | ≤0.4µm |
Manhole | Side upward |
Spral ball | In the center of the inside tank |
Agitator | Raking system conneted into a top reducer |
Chimney | On the top of the tank |
Fermentation system |
- Stainless steel 304 sanitary construction
- 100% TIG welded and sanitary polished
- Design pressure: 1.5-2 bar, test pressure: 3bar
- 4 heavy duty stainless steel legs with adjustable height and leveling footpads
- Interior shell: 304 stainless steel , thickness is 3 mm
- Interior is 2B and exterior finish bright polish, sanitary surface
- Tri-clamp sanitary fitting
- Vacuum & pressure relief valve
- Pressure gauge
- Thermometer gauge
- Sample valve
- Lifting lugs
- Ladder hooks, also designed to hold brewers hose when not is use
- Side manhole
- CIP arm and rotary spray ball 360 degree of coverage
- Dual zone cooling jacket with glycol inlet and outlet
- Rotation racking arm
- Dry hopping hole
- Thermo-well (Temperature sensor is also included)
Delivery |
Services |
– Free consultation service before, during, after sales; Layout in 3D or CAD drawings of your brewery
– Professional engineers going abroad for the installation, debugging, and training, all the travelling cost and locate food and hotel shall be affroded by the buyer
– The installation period is about 15 days including assembling brewing tanks and training the operators. It is free of charge within 15 days. The buyer will be charged USD50 per day for for each engineer for the extended period
– Round the clock assistance via Phone, Email, Skype, WhatsApp, MSN, or any other communication methods available to the customer
– Assist to purchase facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately. If needed, cost calculated additionally
– Brewing technology, brewing recipe, can be offered
– More spare parts are available to offered freely
Contact us |
7BBL 2-vessel fully automated beer brewhouse system
Components of a complete set of brewery system |
Brewhouse system
| Lauter tun |
Mash kettle | |
Mash pump | |
Combined pipes | |
Frequency inverter | |
crusher | |
Heat exchanger | |
Oxygen adder | |
Fermenting tanks
| Fermenting tank |
Valve pipe | |
Cooling pipe | |
Thermal meter | |
Pressure meter | |
Cooling system | Cool water tank |
evaporator | |
refrigerator | |
Ice water pump | |
Pipe & valve | |
Controlling system | Power controlling cabinet. |
Meter controlling board | |
Refrigerator board | |
PLC control board for option | |
Washing system | Washing tanks |
Mobile pump | |
Valve & pipe | |
Beer sale section | Little wooden keg |
Beer valve | |
Soft pipe |
Beer brewhouse system |
Outside surface | RED COPPER or STAINLESS STEEL,THK:1.5mm-3mm |
Inner surface | S.S.304,THK:2mm-4mm |
Top shape | Seal head or conical head |
Heating method | Natural gas/electricity/LPG/direct fire |
Insulation layer | Protected by rockwool,THK:70-100mm |
Polishing | ≤0.4µm |
Manhole | Side upward |
Spral ball | In the center of the inside tank |
Agitator | Raking system conneted into a top reducer |
Chimney | On the top of the tank |
Fermentation system |
- Stainless steel 304 sanitary construction
- 100% TIG welded and sanitary polished
- Design pressure: 1.5-2 bar, test pressure: 3bar
- 4 heavy duty stainless steel legs with adjustable height and leveling footpads
- Interior shell: 304 stainless steel , thickness is 3 mm
- Interior is 2B and exterior finish bright polish, sanitary surface
- Tri-clamp sanitary fitting
- Vacuum & pressure relief valve
- Pressure gauge
- Thermometer gauge
- Sample valve
- Lifting lugs
- Ladder hooks, also designed to hold brewers hose when not is use
- Side manhole
- CIP arm and rotary spray ball 360 degree of coverage
- Dual zone cooling jacket with glycol inlet and outlet
- Rotation racking arm
- Dry hopping hole
- Thermo-well (Temperature sensor is also included)
Delivery |
Services |
– Free consultation service before, during, after sales; Layout in 3D or CAD drawings of your brewery
– Professional engineers going abroad for the installation, debugging, and training, all the travelling cost and locate food and hotel shall be affroded by the buyer
– The installation period is about 15 days including assembling brewing tanks and training the operators. It is free of charge within 15 days. The buyer will be charged USD50 per day for for each engineer for the extended period
– Round the clock assistance via Phone, Email, Skype, WhatsApp, MSN, or any other communication methods available to the customer
– Assist to purchase facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately. If needed, cost calculated additionally
– Brewing technology, brewing recipe, can be offered
– More spare parts are available to offered freely
Contact us |