Turnkey BrewerIes 500L Beer Brewing Equipment Supplies Sweden All in One Beer Machine for Sale
Home » Brewery Equipment » Beer brewery equipment » Turnkey BrewerIes 500L Beer Brewing Equipment Supplies Sweden All in One Beer Machine for Sale

Product Detail

loading

Share to:
sharethis sharing button

Turnkey BrewerIes 500L Beer Brewing Equipment Supplies Sweden All in One Beer Machine for Sale

The complete setup of these breweries is in compliance with modern brewery standards and specifications. These products enable systematic execution of milling, mashing, fermentation, filtration, filling and other related processes. We subject each brewing system to stringent testing procedures before launching them in the market.
Material:
Thickness of material (mm):
Insulation:
Availability:
Quantity:
  • DGET-500L

  • DGET

  • 8438400000

At DEGONG we have striven for the very latest and most modern brewery equipment,  fabricated from high quality stainless steel tanks that gives beers such exceptional flavour.


Beer brewing process:


brewhouse and adding hops-min

2 vessel brewhouse system and adding hops


1-Crushing the malt:

Brewing starts with the crushing of the malt in the grain mill. Malt is grains of barley, wheat or rye that have been allowed to sprout and dry, which is the starting point for beer. The origin of the malt is extremely important for the colour and taste of the finished product. Malt that is roasted to dry will impart a dark colour to the beer.

  

2-Mashing

Once crushed and softened in hot water in the mash tun, we must carefully control the temperature.

Once the early conversion to sugar has finished and the sweet wort has been pumped into the wort kettle, the mash can be discarded. This spent malt is not only does this allow us to discard our waste, but it also becomes a useful resource.

 

3-Boiling the malt and adding hops

The sweet wort needs to be boiled for sterilisation, and to drive off some of the water. During the boil, tasty hops are added. The hops added at the onset of the boil provide the bitter edge, whereas hops added later in the process are more aromatic.

 

4-Chilling and monitoring the wort

After about 90 minutes the boil is finished and the wort must be chilled. Cold water flows through a heat-exchanger from which warm water emerges, ready to kick-start the next brew. The important point here is to control the sugar content and temperature. All measurements are carefully monitored and logged in the Brewer's log.

 

fermentation tanks2-min

Brewery fermenters in cellar


5-Fermenting

The chilled wort is pumped into the cylindrol-conical  fermentation tanks. This is the key part of the entire process:  fermentating. Yeast is added from an earlier brew, plus a little additional oxygen. The oxygen helps the yeast multiply to a suitable concentration. About 24 hours later, the first fermentation froth is removed with a spade and discarded. This is the unwanted froth containing undesirable proteins, dead yeast cells and hop residues.

 

After about 4-7 days of fermentation, yeast is harvested for the next brew. Allowing the beer to ferment in open tubs for the first few days is vital for the speciality taste that distinguishes. Smooth and tender to the tongue, but still a beer with a powerful explosion of flavour.


brewery cellar-min

Brite tanks in cellar


6-Cooling the beer

Cooling wort and refrigerate the fermentation tanks and bright beer tanks by chiller unit and glycol tanks(cold water tanks can also be availabe!)


Welcome to visit our website and contact me to get more useful information, Cheers!!!

Alice新-min


Previous: 
Next: