How to Realize Your Dream and Open a Small Craft Brewery
Home » News » How to Realize Your Dream and Open a Small Craft Brewery

How to Realize Your Dream and Open a Small Craft Brewery

Views: 8519     Author: Site Editor     Publish Time: 2023-02-24      Origin: Site

Documents required to open a self-brew house:

First register a business license, and then apply for a health certificate, health permit, fire certificate, etc.

Then apply for a food business license. After the equipment is installed and debugged, it will be brewed and sent to the local Food and Drug Administration for a test report, and the food business license will be registered.


Craft beer has set off a wave of heat waves in China, rising rapidly at an incredible speed. Opening craft breweries is an inevitable trend of development.

Opening a craft brewery is the dream of many craft beer lovers. However, the cumbersome bidding process drove many people crazy.

After collecting information and consulting relevant professionals, talk about how to build this craft brewery!


In theory, starting a winery requires one approval, one license, two assessments, and one permit.

Preliminary work: 1. Project approval, application for project approval, 2. Business license, 3. Environmental protection assessment, 4. Fire protection assessment.

Later work: 1 food production license


274


According to national regulations, projects that may cause environmental pollution and ecological damage must undergo environmental impact assessment during the feasibility study stage, and then other preliminary procedures can be handled. Therefore, the brewery is no exception. It must conduct environmental impact assessment work before starting construction, and can only apply for a start-up permit after obtaining the approval of the Environmental Protection Bureau.

1. Project approval: The bid for a winery must first obtain the approval of the National Development and Reform Commission, because the National Development and Reform Commission designated the bottling production line with a canning capacity of less than 18,000 bottles per hour in the plan in 2013 as a national eliminated light industry production line, so If you want to obtain approval, you must first consider whether the production capacity of your own production line has reached the national standard. However, the audit standards vary from place to place, it is best to check the local standards. (Guided by national standards and implemented in accordance with local standards.) If the filling capacity cannot meet the national or local standards, it is not absolutely impossible to obtain the "approval report for the declared project".

It is estimated that it is difficult for many people to achieve this output. Response Policy: We do not bottle beer. (we produce barrel beer)


10HL FV 详情02

Premium stainless steel Brewery fermneters


2. Business license:

3. Environmental assessment:

1) First of all, the land where the brewery is located is industrial land, and land of other nature will not be accepted directly

2) Find the EIA unit to write the EIA document (the EIA unit only needs to provide information according to their requirements when preparing the EIA unit. Usually, go to the site first to understand the specific conditions of the surrounding environment; then understand the scale, process, and raw materials of the proposed project etc. For the report form, these contents are basically enough; if it is a report, it also needs monitoring, public consultation, etc. It will be clear after asking the EIA unit. Before asking the EIA unit for quotation, first find out whether there are natural For environmentally sensitive points such as protected areas, water sources, and residential areas, it is sufficient to find out about the project’s investment subject, pre-approval procedures, investment, scale, and craftsmanship.)

4. Fire assessment: Fire hydrants, fire exits, etc. are relatively easy to pass

5. Food production license: For this license, you need to go to the local Food and Drug Administration to apply for it. The window will tell you what materials you need to prepare!

prepare materials:

1) Application for food production license,

2) business license,

3) The floor plan of the food production and processing site and its surrounding environment,

4) The layout plan of each functional area,

5) Process equipment layout,

6) Food production process flow chart,

7) List of main food production equipment and facilities,

8) Purchase inspection records, production process control, factory inspection records, food safety self-inspection, employee health management, recall of unsafe food, handling of food safety accidents,

9) A series of materials related to rules and regulations to ensure food safety,

10) Personnel requirements: analysts,

11) Test the products you leave the factory to ensure that the products are qualified before they can leave the factory.